Optimization
N. Balaji; N. Jawahar
Abstract
This paper deals with a multi-period fixed charge production-distribution problem associated with backorder and inventories. The objective is to determine the size of the shipments from each supplier and backorder and inventories at each period, so that the total cost incurred during the entire period ...
Read More
This paper deals with a multi-period fixed charge production-distribution problem associated with backorder and inventories. The objective is to determine the size of the shipments from each supplier and backorder and inventories at each period, so that the total cost incurred during the entire period towards production, transportation, backorder and inventories is minimised. A 0-1 mixed integer programming problem is formulated. Genetic algorithm based population search heuristic, Simulated annealing based neighbourhood search heuristic and Equivalent variable cost based simple heuristic are proposed to solve the formulation. The proposed methodologies are evaluated by comparing their solutions with the lower bound solutions. The comparisons reveal that Genetic algorithm and Simulated annealing algorithm generate better solutions than the Equivalent variable cost solutions and are capable of providing solutions close to the lower bound value of the problems.
Optimization
G. Kanagaraj; N. Jawahar
Abstract
This paper addresses the mixed integer reliability redundancy allocation problems to determine simultaneous allocation of optimal reliability and redundancy level of components based on three objective goals. System engineering principles suggest that the best design is the design that maximizes the ...
Read More
This paper addresses the mixed integer reliability redundancy allocation problems to determine simultaneous allocation of optimal reliability and redundancy level of components based on three objective goals. System engineering principles suggest that the best design is the design that maximizes the system operational effectiveness and at the same time minimizes the total cost of ownership (TCO). To evaluate the performance of the TCO allocation numerical experiments were conducted and compared with previous for the series system, the series-parallel system, the complex (bridge) system and the over speed protection system. From the results of the numerical investigation, reliability redundancy allocation based on minimum TCO will lead to a more reliable, economical design for the manufacturer as well as user compared with the initial cost optimum design and conventional reliability optimum design.